Woodbridge project
A basement transformation in Prince William Commons.
Follow framing, under-slab plumbing and insulation through finished living areas and a tiled shower bathroom.
Basement finishing
Finish an unfinished basement or remodel an existing lower level with HOM. We review moisture, utilities, room use, proposed bathrooms and any egress requirements before planning framing, electrical work, drywall and finishes.
Discuss your projectA complete scope
Connected work
Review slab condition and product requirements before committing to the lower-level floor finish.
Basement flooring options and preparationWoodbridge project
Follow framing, under-slab plumbing and insulation through finished living areas and a tiled shower bathroom.
Springfield project
Follow a permitted build-out in The Timbers from framing and drywall through recessed lighting, vinyl plank flooring, cabinetry, a utility sink and final trim.
Budget planning
Learn how moisture, utilities, egress, bathrooms and finish level change the scope.
Where quality begins
Moisture, slab condition, utilities, ceiling height and egress are evaluated before finishes conceal the space.
Mechanical areas, storage and circulation are planned so the finished footprint works harder.
Lighting, trim, color and flooring connect the basement visually to the rest of the home.
The HOM difference
The best result comes from decisions being made in the right order. We connect design, scope, selections, permitting, scheduling and construction before the work reaches the finish stage.
Questions to ask early
The existing condition, room layout, moisture concerns, ceiling and utility constraints, bathroom plumbing and finish selections affect the work. An open living area and a layout with a new bathroom or proposed bedroom need different reviews and scopes. A site review is needed before a project-specific estimate.
Resolve moisture concerns, room use and layout first, then plan the framing, utilities and applicable approvals. Required inspections need to be coordinated before covering the work. Product suitability and slab conditions must also be reviewed before installing flooring.
Potentially. Egress, ceiling height, plumbing, ventilation, electrical capacity and local permit requirements must be evaluated first.
The best choice depends on slab condition and moisture. Luxury vinyl is common, while carpet can add comfort in properly prepared spaces.
Yes. We can phase or limit the project around utility rooms, storage needs, budget and the rooms that provide the most value.
Plan your next step
Explore your remodeling goals, material decisions, permit questions and preparation steps before contacting HOM.
Open the HOM Plan BuilderNorthern Virginia service area
Connect this service with local planning guidance, permit resources and relevant HOM project examples for your community.
Real HOM project photography




















Your next project
Tell us what you want to change, and we will help you understand the smartest next step.