Serving Northern VirginiaLicensed & insuredMon–Fri 8 AM–5 PM · Sat by appointment · Sun closed

Bathroom remodeling

Bathroom remodeling and renovation in Northern Virginia.

HOM provides complete bathroom remodeling, walk-in shower renovations and tub-to-shower conversions in Northern Virginia. We plan the layout, build the waterproofing assembly, coordinate the trades and finish the room around the way you use it.

Discuss your project

A complete scope

What your bathroom remodeling project can include.

Complete gut renovationsTub-to-shower and shower-to-tub conversionsDurock and Schluter Kerdi waterproofingFlood testing before tile installationPlumbing fixtures, valves and drainsTile floors, walls, niches and trimVanities, mirrors and lightingGlass doors and finish carpentry

Connected work

Planning more than one room?

If the bathroom is part of a larger update, coordinate utility work, adjoining floors and household access within one construction plan.

Whole-home and multi-room remodeling

Gainesville project

See a Morris Farm bathroom transformation.

Follow a complete one-for-one bathroom rebuild through Schluter waterproofing, self-leveling floor preparation, tile, quartz and the finished illuminated-mirror design.

View case study

Springfield project

See a Lakewood Hills bathroom transformation.

Follow a full bathroom remodel from demolition and doorway reframing through Durock and Schluter waterproofing, the finished tub surround, double vanity and new flooring.

View case study

Vienna project

See a Wayside bathroom transformation.

Follow a compact Vienna bathroom from its original framed shower and pedestal sink through tile installation and the completed frameless-glass design.

View case study

Springfield project

See a Clearfield accessible bathroom transformation.

Follow a primary bathroom from its original drop-in tub through framing, whole-room self-leveling, Schluter waterproofing and the finished curbless shower.

View case study

Alexandria service guide

Planning a bathroom remodel in Alexandria?

See local planning guidance and two documented completed bathroom projects in the Kingstowne area.

Read the guide

Completed project

See a Kingstowne primary bathroom case study.

Follow a complete Alexandria renovation from demolition, framing and waterproofing through the finished shower, tub, vanity and storage.

View case study

Completed project

See a second Kingstowne-area bathroom transformation.

Review another verified Alexandria project with marble-look tile, a sliding-glass tub enclosure, grab bars, storage and coordinated finishes.

View case study

Alexandria location hub

Explore remodeling guidance for Alexandria homes.

Connect the Kingstowne project evidence with Alexandria-area planning, jurisdiction guidance and related local work.

Read the guide

Completed project

See a Potomac Shores walk-in shower case study.

Review a Dumfries bathroom renovation with construction, waterproofing, tile and finished-room photographs.

View case study

Budget planning

What shapes a bathroom remodeling estimate?

Compare preparation, waterproofing, utilities, fixtures and finish selections before choosing a scope.

Read the guide

Focused service guide

Considering a tub-to-shower conversion?

See how drainage, waterproofing, tile, glass and access should be planned as one complete wet-area project.

Read the guide

Planning guide

Does your bathroom need more than a repair?

Review recurring moisture, ventilation, layout and finish problems that may justify a complete remodeling plan.

Read the guide

Planning guide

Make a small bathroom work harder.

Use clearances, storage, lighting and shower planning to improve a limited footprint.

Read the guide

Selection guide

Choose fixtures from verified specifications.

Coordinate faucets, valves, toilets, vanities, lighting and accessories with the measured room and construction scope.

Read the guide

Homeowner guide

Connect bathroom improvements to long-term value.

Prioritize condition, function and appropriate finish levels without relying on unsupported return-on-investment promises.

Read the guide

Where quality begins

The work behind the finish.

01

Water control first

The waterproofing assembly, transitions and flood test are treated as core construction, not hidden shortcuts.

02

A layout that works

We study clearances, storage, fixture placement and daily routines before finishes are selected.

03

One complete scope

Plumbing, electrical, tile, paint, glass and final details are coordinated under one plan.

The HOM difference

Designed and managed as one project.

The best result comes from decisions being made in the right order. We connect design, scope, selections, permitting, scheduling and construction before the work reaches the finish stage.

3D planningLicensed & insured5-year warranty

Questions to ask early

Practical answers before you commit.

How much does a bathroom remodel cost in Northern Virginia?+

A finish replacement and a full gut bathroom are different scopes. Size, layout changes, hidden damage, waterproofing, tile coverage, fixtures and glass all affect the price. HOM prepares a project-specific estimate after reviewing the room and selections; a broad company project range is not a bathroom quote.

How long will my bathroom be out of use?+

That depends on demolition, plumbing and electrical changes, applicable inspections, waterproofing and testing, tile installation, and glass or fixture availability. Confirm a second-bathroom plan before work starts. We discuss the construction sequence and expected room access after the scope is defined.

Can I supply my own bathroom fixtures or tile?+

Tell us what you already have before the estimate. Product model numbers, dimensions, quantities and installation requirements help us check compatibility. The written scope should identify who handles ordering, missing parts, delivery, returns and product warranties.

Can you convert my tub to a walk-in shower?+

Yes. We can plan a tub-to-shower conversion, including drain and valve work, waterproofing, tile, glass and safety features appropriate to the space.

How is the shower waterproofed?+

Our standard wet-area method uses a cement-board substrate with Schluter Kerdi waterproofing and a flood test before finish tile is installed.

Do you handle permits and inspections?+

When the scope requires permits, we coordinate the applicable documentation and inspection sequence as part of the project plan.

Plan your next step

Turn your ideas into a consultation brief.

Explore your remodeling goals, material decisions, permit questions and preparation steps before contacting HOM.

Open the HOM Plan Builder

Northern Virginia service area

Bathroom remodeling planning near you.

Connect this service with local planning guidance, permit resources and relevant HOM project examples for your community.

Your next project

Let's make the plan clear.

Tell us what you want to change, and we will help you understand the smartest next step.