Prepare and protect
Access routes, adjacent finishes and work areas are addressed before active construction begins.
Step 03 · Build
Construction is where drawings, selections, site conditions and specialty trades must work as one sequence. HOM coordinates the day-to-day work around the approved scope and keeps important decisions visible as the project moves forward.
Start with a consultationWhat this stage includes
Before demolition begins, the project team confirms the working scope, access plan, protection needs, known selections and scheduling conditions. Materials and long-lead items are coordinated according to the project plan, and permit or inspection steps are incorporated when the work requires them.
During construction, the sequence typically moves from protection and selective demolition through framing, mechanical, electrical and plumbing rough-ins, required inspections, wall and floor preparation, finish installation and final detailing. The exact order changes with the room, jurisdiction and conditions found after the existing work is opened.
How it moves forward
Each checkpoint turns information into a clearer decision, record or piece of completed work.
Access routes, adjacent finishes and work areas are addressed before active construction begins.
Selective demolition exposes the real conditions. Measurements and planned details are checked against framing, utilities and any concealed issues that become visible.
Framing and specialty trades are sequenced so locations, clearances and inspections support the approved layout.
Preparation, cabinetry, tile, flooring, fixtures, trim, paint and other finishes are completed in a coordinated order with quality checkpoints along the way.
What you gain
These are the practical outputs that help the project advance responsibly.
A practical order of work connecting demolition, rough-ins, inspections, preparation and finish installation.
Questions, approved changes and material decisions are kept connected to the written project record.
Critical concealed and finish stages are reviewed before the next layer of work makes them difficult to inspect.
An important distinction
If demolition reveals concealed damage, undocumented utilities or framing that differs from the visible conditions, HOM explains the finding and its effect before related extra work proceeds. Material substitutions, owner-requested revisions and scope changes should be documented so cost and schedule consequences remain clear.
Common questions
Communication expectations and project contacts are established before work begins. Updates focus on current progress, upcoming decisions, schedule dependencies and any conditions that require your approval.
Responsibility is defined in the written scope. When HOM's work requires permits that are included in the agreement, the related permit and inspection steps are coordinated with the project sequence.
The affected work is evaluated, the condition is documented and the available response is explained. Work outside the agreed scope is handled through a written change process before it proceeds.